Infrastructure Development Works of Prism 9, Phase IX, (Sector F, G & L) DHA Lahore
(Package – 05)
Cost: Rs. 2,457.00 Million
Duration: Mar-05-2017 to 2021
Client: Defence Housing Authority, (DHA) Lahore
Infrastructure Development Works of Prism 9, Phase IX, (Sector F, G & L) DHA Lahore
(Package – 05)
Cost: Rs. 2,457.00 Million
Duration: Mar-05-2017 to 2021
Client: Defence Housing Authority, (DHA) Lahore
Construction of 24KM of Main Roads with the width of 150 & 120 feet including
complete Horticulture / Landscaping and Strom Water Drainage system..
Cost: Rs. 5,501.00 Million
Duration: Feb-01-2016 to Dec-31-2021
Client: Defence Housing Authority, (DHA) Lahore
Construction of signal Free Corridor from Walton Road to Lalik Jan Chowk
DHA Lahore, including one Flyover at Walton Road, one Underpass and
one Flyover at PSO Chowk, one Underpass at Masjid Chowk, one
Underpass at Ghazi chowk and Re-Modeling of Road at Lalik Jan Chowk.
Development and construction of complete road with rigid pavement as well
including HT/LT removals in consent with LESCO, lighting, complete
Horticulture / Landscaping and Strom water Drainage system.
Cost: Rs. 3,149.00 Million
Duration: November 06, 2017 to October 04, 2018
Client: Defence Housing Authority (DHA)
4 Extension of existing River Ravi Bridge western side.
Client : Lahore Development Authority (LDA)
Consultant : NESPAK
Construction of 2-Flyovers each with 3-Lane road at Shahdara Morr on
Main GT Road with RCC Wall Ramps, Drainage works, Sub-Base & Base,
Surface course and Pavement, Drainage works, Road Lighting Network,
Dismantling, Relocation and strengthening of existing pedestrian bridge
for Metro station also dismantling of Metro U-turn, traffic diversion and
Ancillary works etc.
Cost : 7627.00 Million
Duration: January 12, 2023 to date
Client: Lahore Development Authority (LDA)
Construction of 2-lane bridge over Soan River on Islamabad Highway in Islamabad;
Cost: Rs. 182.08 Million
Client: Capital Development Authority, Islamabad
Complete Interior Finishing Works of Union Bank Limited Building at Egerton Road, Lahore including furniture and fixtures.
Cost: Rs. 10.80 Million
Client: Union Bank Limited
Construction of 04 Nos. Bridges and Carpeting at Rawat Highway in Islamabad;
Cost: Rs. 301.74 Million
Client: Capital Development Authority, Islamabad