Signal Free Corridor – Islamabad Highway
Construction of 04KM of length either side with 4-Lane on each side along-with grade separated facility from Zero Point to Faizabad Interchange and Construction of Interchange at I-8 Intersection, Islamabad including complete Horticulture / Landscaping and Strom water Drainage system(Phase-I).
Cost: Rs. 1,578.00 Million
Client: Capital Development Authority (CDA)
Construction of 04KM of length either side with 4-Lane on each side along-with grade separated facility from Zero Point to Faizabad Interchange and Construction of Interchange at I-8 Intersection, Islamabad including complete Horticulture / Landscaping and Strom water Drainage system(Phase-I).
Cost: Rs. 1,578.00 Million
Client: Capital Development Authority (CDA)