Signal Free Corridor – Islamabad Highway

Project Info

  • Construction Date

    Jun 30, 2015 - Dec 05, 2015

  • Category

    Roads / Highways

Construction of 04KM of length either side with 4-Lane on each side along-with grade separated facility from Zero Point to Faizabad Interchange and Construction of Interchange at I-8 Intersection, Islamabad including complete Horticulture / Landscaping and Strom water Drainage system(Phase-I).

Cost:                    Rs. 1,578.00 Million

Client:                 Capital Development Authority (CDA)