Islamabad Expressway
Construction of Islamabad Expressway 8 KM either side with 5 lanes on each side in Islamabad. Two (2) outer lanes of Rigid Pavement for heavy traffic and three (3) inner lanes of flexible pavement for light traffic.
Cost: Rs. 1,283.00 Million
Client: Capital Development Authority, Islamabad
Construction of Islamabad Expressway 8 KM either side with 5 lanes on each side in Islamabad. Two (2) outer lanes of Rigid Pavement for heavy traffic and three (3) inner lanes of flexible pavement for light traffic.
Cost: Rs. 1,283.00 Million
Client: Capital Development Authority, Islamabad