Bus Rapid Transit System (BRTS) Project Package V

Project Info

  • Construction Date

    Aug 07, 2012 - Feb 10, 2013

  • Category

    Roads / Highways

Construction of Bus Rapid Transit System (BRTS Project) for Lahore-Ferozepur Road Corridor (Package-V). Construction of 3.9KM length of 2-Lane BRTS Road including steel bar on both sides, along-with 5-Lane dual carriageway (asphalt work) on each side of the project. Construction of Bus Stations, pedestrian bridges, underpass, culverts and installation of Escalators, Generators, Panels, Lighting Poles etc.

Cost:  Rs. 1,620.00 Million

Client: TEPA / LDA