Infrastructure Development Works of Prism 9, Phase IX, (Sector F, G & L) DHA Lahore
(Package – 05)
Cost: Rs. 2,457.00 Million
Duration: Mar-05-2017 to 2021
Client: Defence Housing Authority, (DHA) Lahore
Infrastructure Development Works of Prism 9, Phase IX, (Sector F, G & L) DHA Lahore
(Package – 05)
Cost: Rs. 2,457.00 Million
Duration: Mar-05-2017 to 2021
Client: Defence Housing Authority, (DHA) Lahore
Construction of 24KM of Main Roads with the width of 150 & 120 feet including
complete Horticulture / Landscaping and Strom Water Drainage system..
Cost: Rs. 5,501.00 Million
Duration: Feb-01-2016 to Dec-31-2021
Client: Defence Housing Authority, (DHA) Lahore
Construction of signal Free Corridor from Walton Road to Lalik Jan Chowk
DHA Lahore, including one Flyover at Walton Road, one Underpass and
one Flyover at PSO Chowk, one Underpass at Masjid Chowk, one
Underpass at Ghazi chowk and Re-Modeling of Road at Lalik Jan Chowk.
Development and construction of complete road with rigid pavement as well
including HT/LT removals in consent with LESCO, lighting, complete
Horticulture / Landscaping and Strom water Drainage system.
Cost: Rs. 3,149.00 Million
Duration: November 06, 2017 to October 04, 2018
Client: Defence Housing Authority (DHA)
Construction of Buildings with covered area 375,000 Sft. of The Italian
Embassy in Islamabad, comprising of 04-Blocks including:
1) Chancellery Building
2) Ambassador Residence
3) Service Block-1
4) Service Block-2
Work comprises of Civil, Electrical, Mechanical, Plumbing, HVAC,
Complete Interior & Exterior Finishes, Firefighting, Water Supply,
Drainage & Sewerage System, Landscaping and Horticulture Works etc.
Contract Value: Rs. 2,480.00 Million
Duration: April 02, 2021 ~ to-date
Client: The Italian Embassy, Islamabad
4 Extension of existing River Ravi Bridge western side.
Client : Lahore Development Authority (LDA)
Consultant : NESPAK
Construction of 2-Flyovers each with 3-Lane road at Shahdara Morr on
Main GT Road with RCC Wall Ramps, Drainage works, Sub-Base & Base,
Surface course and Pavement, Drainage works, Road Lighting Network,
Dismantling, Relocation and strengthening of existing pedestrian bridge
for Metro station also dismantling of Metro U-turn, traffic diversion and
Ancillary works etc.
Cost : 7627.00 Million
Duration: January 12, 2023 to date
Client: Lahore Development Authority (LDA)
Construction of Underpass along Bedian Road at Roundabout near
Lahore Ring Road (LRR), Lahore, connecting Phase-V with Phase-VI
DHA, Lahore.
This Project Includes :
Cost: Rs. 2100 Million
Client: DHA-LDA Lahore
Construction of Penta Square CCA DHA Phase V Lahore.
Package II
Gray Structure (Block A ,B)
Package III
Gray Structure (Block C,D,E & F)
Cost: Rs. 2307 Million.
Client: DHA Lahore.
Construction Of Defence Raya Golf & Country Club (DRGCC) DHA Phase VI Lahore.
Cost: Rs. 2,810.00 Million.
Client: DHA Lahore.
Widening & Improvement of Main Sheikhupura Road of 06KM length either side with 3-Lane on each side where 4-Lane in section-II and construction of storm water drain and fixing of curbstones on both sides. Construction of parking along the road fixing tuff pavers in section-I, II & III, where constructed 3KM wall in Section-III. Installation of lighting poles & complete electrical works.
Development of Park 20,000 Sft. (Landscape, Entry Gate, Gazebos, Monuments, walls, Grills, Footpaths & Filling etc.) and Construction of 04 Monuments at Bypass, Batti Chowk, Rafi Chowk & SP Chowk
Cost: Rs. 1,229.00 Million
Client: Lahore Development Authority (LDA)